Jackson 4 way Power Board With Surge Protection & 3m Long-lead (PT4113)

SKU : PT4113
Brand : Jackson Power
Availablity : Online Only, In Stock
Ships within 1 and 3 days from our Seven Hills, NSW warehouse or Pickup in 3 to 4 days
Length: 3M, Outlet: 4, Plug: R/Angle, Colour: White, Warranty: 01 Year, PT4113.
Ask a question about this product
$18.00

Estimated Shipping

For Bulky items and non-metro Australia a different shipping will be quoted on order receipt.

No surcharge On Credit Card, AMEX or Paypal. American express, master card, nab, Paypal, visa

Share

  • Description
  • Specifications
  • Reviews

Product Description

Manufacture # Jackson | Model #  PT4113

 

These high-quality budget priced powerboards offer customers a high rated level of surge and overload protection. Features handy right-angle plug, 3-meter power cord, and strip design to fit neatly behind furniture and office equipment.

 

Features: 

  • This slim Power Board is equipped with an Extra-long 3 Metre lead, allowing you to get power where you need it. 
  • Built-In Surge Protection will protect your valuable equipment from unexpected surges. 
  • The modern slim design allows it to fit snug behind your office equipment/furniture. 
  • Plus an on-board Master Switch means you don't need access to your wall switch to turn off the power.

 

Overview:

  • Length: 3M
  • Outlet: 4
  • Plug: R/Angle
  • Colour: White

 

  Manufacturer Warranty: 01 Year Limited Warranty

Write Review
Write Review
Ask Question
Ask Question

Customers Also Viewed These

Customers Also Bought These

Free shipping on half the catalog items

Fast Shipping

Fast Shipping on all stocked items

24/7 Support

Secure payment with no Surcharge

Payment

Secure payment with no Surcharge

We carry all leading trusted brands

Trusted brands

We carry all leading trusted brands

Experienced staff with technical know

Experienced and Reliable

Experienced staff with Technical Knowledge

All our stock is locally sourced with local warranties

Australian Stock

All our stock is locally sourced with local warranties

Item Added to Cart Successfully

$

Items

View Cart
Home Home Brands Brands Cart 0 Cart Dashboard Account